Especially picked large projects at overseas

01)、
Time of Transportation: from March to October in 2007
Successfully designing logistics scheme and shipping batch equipments for Indian company PECZ and Iran company CFRD, 3 sets of cement plant and 3 sets of heat-engine plant, about 30000cbm in total, weight 150mt and length 14m of the largest single unit.
   
02)、
Time of Transportation: from June in 2008 to November in 2009
Successfully designing logistics scheme and shipping complete plants for Indian group GPIL and Iran enterprise ARYA, 3 sets of large pellet production pipeline and 3 sets of heat-engine plant, about 60000cbm in total, weight 350mt and length 15m of the largest single unit.


03)、
Time of Transportation: from July in 2008 to October in 2009
Successfully designing logistics scheme and shipping about 5000mt-25000mt oilfield exploitation pipes respectively for Colombia mining company CSKZ/Algeria oil trade company FGRP/ Brazil oil trade company ETPF, the length 16m-20m per single unit.



04)、
Time of Transportation: from May in 2009 to May in 2010
Successfully designing logistics scheme and shipping complete plants for Thai heat-engine company DRGP AND Indonesia electric power company PCQF, respectively 2-4 sets of cement plant and hydro power station, about 28000cbm in total, weight 98mt and length 22m of the largest single unit.



05)、
Time of Transportation: from October in 2008 to June in 2010
Successfully designing logstics scheme and shipping buses/engineering cars/semi-trailers for Nigeria group CDF/Angola trade company QD/South-Africa minging company HHQD from Tianjin, Shanghai and Guangzhou, about 250-300 units.

   


06)、
Time of Transportation: from April in 2010 to March in 2011
Successfully designing logistics scheme and shipping complete plants for Ukraine company KBCC/Georgia group CEFT/Turkey company DCGG, respetively 2-5 sets of nuclear power station and hydro power station, about 47000cbm in total, weight 450mt and length 18.5m of the largest single unit.


      

07)、
Time of Transportation: February in 2010 and May in 2011
Successfully designing logistics scheme and shipping complete plants of steel structures for Lybia investment company DAR/Chile investment company SGH/Venezuela oil company PPFJ, respectively 3-4 sets of cement plant and construction plant, about 23000cbm in total, weight 85mt and length 33m of the largest single unit.


     


 

 